This is Our Livening Process It Includes Safety Checks, Test Results & Temp Supply Decoms
*
Indicates required field
Address
*
ICP Number
*
CoC Number
*
Electricians Name
*
Electricians Phone Number Email Optional
*
Electricians Registration
*
RoI Number
*
EsC Number
*
Safe Working
Required Competency
*
Current Practicing Licence
Current Safety Refresher
Current First Aid Refresher
Approved by Sns
Identified Risks on this Job
*
Contact with Electricity
Uncontrolled Energy Release
Public Safety
Vehicle Impact
Critical Controls for My Indentified Risks
*
Use of PPE
Use Exclusion Zone
Boxes Closed if Unattended
Work is Pavement/Property
Safe Distance to the Lane
PPE in Use
*
8 Cal Full Body Cover
Insulating Gloves 1000V
Eye Protection
Safety Footware
Check PPE before Use
PPE is Tested & Current
Emergency Planning
Job sites vary from day to day so it is important to establish a plan in the event there is an accident.
C
onsider your own safety first
Decide on a safe plan
Always stay calm
Establish an Assembly Location
Injury procedures
Shut down plant or equipment
Take safe actions to control event
Prevent further harm or damage
Provide first aid
Stay with Injured
Dial 111 and ask for AMBULANCE
Fire
Evacuate the site to the safe area
If safe to do so extinguish the fire
Dial 111 and ask for FIRE
Earthquake procedures
Keep clear of structures
Evacuate the site to the safe area
Remain in the assembly area
Gas Leak
Evacuate the site to the safe area
Stay upwind of the leak
If safe eliminate the leak
Dial 111 and ask for FIRE
Location of Emergency Equipment
*
First Aid Kit is Front Seat
Fresh Water is Front Seat
Extinguisher is Front Seat
My Vehicles Registration Is
*
Livening the Connection
After Livening take Photos off the metering switchboard & Orion box
Installation Complies With AS/NZS3000 Is
*
Has Overcurrent Protection (2.5.1.1)
No Contact to Cables (3.10.1.1)
No Contact to Live Parts (3.10.1.1)
Has Spread of Fire Protection (2.9.7)
Switchboard Location (2.9.2.5)
Mains are Correctly Rated (3.4)
Main Earth is Correctly Rated (5.3.3.2)
Mains Cable Size
*
Main Earth Size
*
The Test Results
First Read is the voltage
Second Read is Insulation Resistance in Mega Ohms
Third Read is Loop Line in ohms
Example
230 - 999 - 0.49
Red Neutral
*
White Neutral
*
Blue Neutral
*
Red White
*
Red Blue
*
White Blue
*
Neutral Earth
*
Main Earth Continuity in Ohms
*
RCD Test Results
First Read in ms at 30mA
Second Read in ms at 150mA
Third Read is Ramp in mA
Forth Read is 1/2 Rated (no trip)
E
xample
27 - 9 - 25 - no trip
RCD 1 Reads
*
RCD 2 Reads
*
Rotation
*
Single Phase
Three Phase Clockwise
Three Phase Anti Clockwise
Is Metering Installed
*
Select - YES or NO
YES
NO
Connection Info
*
Fused on Pole
Fused in Orion Box
ICP Label fitted at Metering
ICP Label fitted at NCP
Main Switch is Off
Site is Safe after Livening
Decom Builders Temp Supply (BTS)
You Must get a photo of the meter reads before disconnecting
Detail All Meter Reads
*
Decom Safety Checks
*
BTS has been disconnected
No Live Equipment Remains
Site is Safe after BTS Decom
Comments
*
Tested by Brendan Yates Practicing Licence Number I3012